Quiet time

July 29, 2008

Well as of today things are quiet. The plumbers finished up all the rough in work on all floors, connected the city main and also the geo well lines to the home. I had them run 1″ lines from outside all the way in to the basement 1st where I have a main valve handy. The city service then drops to 3/4″ and 1/2″ through out the home and the Geo well water remains 1″ service to all outside faucets and both Geo water furnace units across the home.

We also signed contract with Rinehart Services Co for 2 Water furnace units. A 4 and a 5 ton unit with 5 digital zones controlling dampers for the home plus both units will provide hot water during a/c of which Im planning on installing a second hot water tank for the 5 ton unit and also connecting to a future outside solar panel system for hot water. Possible in the winter Im hoping with a ground mounted system protected by the home facing south I might get enough warmth to help cover the radiant slab heat needs without too much gas backup.

Shane Rinehart of Rinehart Services will be onsite in a couple days to begin installing the ducts starting from the basement mechanical areas into the 20″ floor truss system and hopefully up to the 3rd floor office avoiding the attic space completely. It looks like we can do it, just have to place it and see. If all goes well the geo units will arrive the following week from the factory and be connected. I will run temporary power to each unit and should be up and running in a couple week. Might be a really night place to work in for the remaining construction, Less sheet rock and painting.

Last, the natual gas / wood burning fireplaces arrived. We installed a large unit in the living room and a med 3 glass sided unit in the area between the kitchen breakfast and family room. We went with both gas/wood to save on energy costs if we choose to burn wood more of the time. It might be messy but wood puts out more heat.

We are still entertaining prices on Foam insulation for the walls and attic. Seems the 2 I have talked with on site each recommend something slightly different so I think its going to come down to personal choice and what I feel is most efficient to protect the home from the outside temps. We will meet with another local contractor this week for what I hope might be the last bid tho we still have time.

Electrical should start next week. Im finishing up the electrical plans when I have some time and will be meeting with our Electrician this Friday. Im planning on doing some of the work myself to keep some costs down and will also be running 100% of all the voice, data and video security since thats my gig.

Laurie and I are also expecting our 1st pool & spa bid very soon so we are keeping our fingers crossed.

Some pictures below.

Kitchen Fireplace:

Last of the roofing:

h1

Website adjustment

June 23, 2008

Today I moved the news/blog to wordpress mostly because they cross categorize my posts and they do a better job of getting Google and Yahoo to pickup the main website www.7617lot23.com onto the Net. The original posts starting back in Jan 2008 were all moved up wordpress today, hense the double dates. I wont have to do that after this message.